top of page

Electrical System Upgrade for Tugboat

Complete rewiring and installation of upgraded switchboards for a 30-ton bollard-pull tugboat.

Challenges

  • Frequent electrical failures

  • Outdated control systems

  • Safety concerns reported by crew


Scope of Work

  • Complete electrical rewiring

  • New switchboard installation

  • Control panel integration

  • Breaker testing & load balancing

  • Documentation for marine certification


Process Executed

We replaced all outdated wiring, installed new marine-grade switchboards, integrated control panels, and performed load testing.


Results / Outcome

  • 100% reduction in electrical faults

  • Improved operational reliability

  • Enhanced safety during towing operations

WhatsApp Image 2025-02-13 at 11.53.09.jpeg

Get in Touch!

Head Office

Workshop 07, Warehouse 334, Dubai Maritime City

Get In Touch

+971 04 433 8846            info@shipworkztech.com

Follow Us

  • Whatsapp
  • Facebook
  • Linkedin

Any Questions or Remarks? Just Write Us a Message !

bottom of page