top of page

Crane System Hydraulic Repair

Refurbishment of crew accommodation including flooring, painting, lighting, and HVAC servicing.

Scope of Work

  • Cylinder seal replacement

  • Hydraulic hose renewal

  • Control valve testing

  • Pressure settings optimization


Results

  • Smooth crane movements

  • Load lifting stability restored

  • Hydraulic leakage eliminated

WhatsApp Image 2025-02-13 at 11.53.09.jpeg

Get in Touch!

Head Office

Workshop 07, Warehouse 334, Dubai Maritime City

Get In Touch

+971 04 433 8846            info@shipworkztech.com

Follow Us

  • Whatsapp
  • Facebook
  • Linkedin

Any Questions or Remarks? Just Write Us a Message !

bottom of page